STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Completing the String Job
Once the nal cross string is tensioned and
clamped, tie off at the appropriate hole speci-
ed by the racquet manufacturer. Remove the
frame from the mounting system by releasing
the racquet holddowns and loosening the
mounting stands.