Gamma PROGRESSION Els STRINGING MACHINE (Issue 1 - March Manual de usuario Pagina 11

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 19
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 10
10
STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Completing the String Job
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fied by the racquet manufacturer. Remove
the frame from the mounting system by
loosening the shoulder supports and frame
supports.
Vista de pagina 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Comentarios a estos manuales

Sin comentarios